there is a lot of work going on around here as one of the twin lines is welded and the other bolted together which is being replaced with welded - the other big project is twinning the tracks on the bridge over the Trent River.
I've noticed a huge reduction in the train traffic here - used to be about 50 trains per day between the CN and CP, now it's mostly CN passenger service between Montreal and Toronto
(no subject)
Date: 2008-12-10 01:40 am (UTC)I've noticed a huge reduction in the train traffic here - used to be about 50 trains per day between the CN and CP, now it's mostly CN passenger service between Montreal and Toronto